simulation modeling of change orders and their impact on building projects performance in gaza strip

simulation modeling of change orders and their impact on building projects performance in gaza strip
simulation modeling of change orders and their impact on building projects performance in gaza strip

مشاركة

Share on facebook
Share on linkedin
Share on twitter
Share on email

simulation modeling of change orders and their impact on building projects performance in gaza strip

 

 

 

simulation modeling of change orders and their impact on building projects performance in gaza strip
simulation modeling of change orders and their impact on building projects performance in gaza strip

 

تأليف: mohammed f. al- hams(اعداد):: rifat rustom(مشرف)
اللغة: إنجليزي
النشر: gaza strip:author 2010
المكان: غزة-المكتبة المركزية-مكتبة الكترونية
النوع: رسائل جامعية
عدد الصفحات:
المواضيع: project managment – executive management:: ادارة المشروعات:: المشاريع – ادارة و تنظيم
رقم التصنيف: 658.404
الرقم العام: 3101399

العنوان : simulation modeling of change orders and their impact on building projects performance in gaza strip

ABSTRACT

The main character of the construction projects is complexity where many human and non-human factors and variables play essential roles. So, when change orders occur all projects performance strongly affected. A recent survey of professional engineers identified changes as the major cause of project failure and Gaza Strip is not exception where the main cause of delay, over budgeting, and productivity losing in Gaza Strip are due to change orders.

This research discusses the change orders and their impact on projects performance in the Gaza Strip using a combination of interviews and 15 case studies.
These studies encompassed 6 educational building projects, one of which was rehabilitation, 4 health building projects, two of which were rehabilitation, and, 5 residential building projects carried out in the Gaza Strip. These projects were investigated to collect the data required for in-depth study and analysis. The projects documented and analyzed were between 1996 and 2005.

From the case studies and interviews, factors influencing the number of change orders in the Gaza strip were determined and then the impact of change orders on cost, time, and productivity for each factor was also determined for the 15 case studies. The factors were ranked according to their occurrences and impact on projects performance to find the most important factors.

A simulation model was built to model change orders occurrences and their impact on cost, time, and productivity for building projects in the Gaza Strip.

Verification of the model was checked and was given 97% accuracy in forecasting increase in cost, 99% accuracy in forecasting decrease in cost, and 96% accuracy in forecasting time extension. The validity of the model was also checked firstly by interviews and then by examining a random case, where it gave 97% accuracy in forecasting increase in cost, and 98% in forecasting extension on time, which means that the simulation model can forecast the impact of change orders on project performance in the Gaza strip.

 

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

تحميل [2.31 MB]

 

simulation modeling of change orders and their impact on building projects performance in gaza strip
simulation modeling of change orders and their impact on building projects performance in gaza strip
simulation modeling of change orders and their impact on building projects performance in gaza strip
simulation modeling of change orders and their impact on building projects performance in gaza strip

 

طالع أيضا 

 

المصدر 

 

اشترك في النشرة الإخبارية لدينا

احصل على التحديثات وتعلم من الأفضل

طالع المزيد

كيفية اعداد دراسة حالة
إعداد البحث العلمي

كيفية اعداد دراسة حالة: 4 خطوات رئيسية

دراسة الحالة هي دراسة مفصلة لموضوع معين، مثل شخص أو مجموعة أشخاص أو مكان أو حدث أو منظمة أو ظاهرة. تُستخدم دراسات الحالة بشكل شائع في البحوث الاجتماعية والتعليمية والسريرية والتجارية. ونناقش في هذا المقال كيفية اعداد دراسة حالة.   فهرس المحتويات1 مقدمة2 متى يجب القيام بدراسة حالة؟3 خصائص دراسة الحالة الجيدة4 أمثلة على دراسة

ما هو المنهج الاثنوغرافي أو دراسات وصف الأعراق البشرية
إعداد البحث العلمي

ما هو المنهج الاثنوغرافي أو دراسات وصف الأعراق البشرية

المنهج الاثنوغرافي هو نوع من البحث النوعي الذي يتضمن الانغماس في مجتمع أو منظمة معينة لمراقبة سلوكهم وتفاعلهم عن قرب. تعني كلمة “الإثنوغرافيا” وصف الأعراق البشرية، وتشير إلى التقرير المكتوب للبحث الذي ينتجه عالم الإثنوغرافيا بعد ذلك.   فهرس المحتويات1 مقدمة2 ما هو المنهج الاثنوغرافي أو دراسات وصف الأعراق البشرية؟3 مزايا المنهج الاثنوغرافي (وصف الأعراق

يسعدنا ان نقدم لكم خدماتنا

تواصل معنا

small_c_popup.png

تواصل معنا لتعرف أكثر
حول تحكيم ونشر الأبحاث وجميع خدماتنا اللغوية والبحثية

يسعدكم افادتكم بكل ما تودون معرفته